Delivery delay
Customers complain that fuel does not arrive on time.
King Khalid University · College of Business
MIS4114-3 · Business Modeling
A Business Process Reengineering study focused on improving the efficiency and effectiveness of gasoline transportation, unloading, safety, and truck return.
Institution
King Khalid University
Department
Business Informatics
Semester
Spring · S2 · 462
01 / Case for action
Current pressure
Transporting gasoline to stations has become expensive and difficult, while customers report late fuel arrival.
Vision statement
“To become the best supplier of gasoline in the region, we must first improve efficiency and then develop the transportation process.”
Identify the gasoline delivery process and locate trouble stages.
Study documents, stakeholders, delivery times, inventory, and demand.
Apply documented people, vehicle, support, scheduling, and safety enablers.
02 / Process identification
The source identifies five connected stages. P3 and P4 are explicitly marked as the processes in trouble.
Set a schedule and route for each truck.
03 / Documented problems
Customers complain that fuel does not arrive on time.
Potholes and diversions obstruct trucks during travel.
Road congestion delays trucks; city entry and exit times require attention.
A truck may break down during transportation, requiring rapid support.
Customers must be cleared and safety guidance provided before unloading.
The unloading process requires newer fire-safety tools and equipment.
04 / Management commitment
The project asks management to approve three immediate solutions: newer trucks, new safety equipment, and a backup truck.
Bring newer trucks and sell older ones.
Provide new equipment for safer operation.
Deploy support when a sudden problem occurs.
Documented cost table
The source’s total is ambiguous, so it is not recalculated here.
05 / Evaluation of design enablers
Trucks with fire alarms; newer vehicles are also proposed for the unloading process.
Modern communication devices, a support truck, spare parts at headquarters, and rapid-response teams.
Software to schedule truck entry and exit times in cities to reduce congestion.
Predictive devices at stations to avoid congestion and long waits.
New equipment and tools for protection from fires.
06 / Acquiring process understanding
Stakeholder
Stakeholder
Stakeholder
Stakeholder
Customer segment
Customer segment
Customer segment
07 / Creative process design
Develop drivers’ skill, time commitment, and ability to solve transport problems quickly.
Replace older trucks with modern, larger trucks that consume less gasoline.
Prepare plans for each truck so it reaches the appropriate place with fewer problems.
Place a communication device in each truck for support during difficult problems.
Prepare support teams for rapid arrival when problems occur.
08 / Process flowchart
Select a step to review its role. Decision branches preserve the cleanliness and fuel-availability checks shown in the source flowchart.
09 / Main activity chart
Date in source: 09-04-2025. Time units and value classifications are not specified in the document.
| No. | Description | Time | Value code | Symbols shown |
|---|---|---|---|---|
| 01 | Set a schedule for each truck | 12 | Not classified | ○ □ → D ∇ |
| 02 | Make sure the truck is clean | 20 | Not classified | ○ □ → D ∇ |
| 03 | Filling the truck with gasoline | 16 | Not classified | ○ □ → D ∇ |
| 04 | Identity verification | 6 | Not classified | ○ □ → D ∇ |
| 05 | Arrival time | 30 | Not classified | ○ □ → D ∇ |
| 06 | Packing equipment | 8 | Not classified | ○ □ → D ∇ |
| 07 | Filling tanks with fuel | 28 | Not classified | ○ □ → D ∇ |
| 08 | Return trucks | 30 | Not classified | ○ □ → D ∇ |
| 09 | Ensure the safety of the truck | 5 | Not classified | ○ □ → D ∇ |
10 / Before vs. proposed
11 / Project conclusion
“If these solutions are activated, the company’s position will be improved for the better.”
The redesign joins driver development, modern trucks, route planning, roadside support, city scheduling, station preparation, and fire safety around the two trouble stages: road travel and fuel unloading.